×

Warning message

The installed version of the browser you are using is outdated and no longer supported by Konveio. Please upgrade your browser to the latest release.

UDO Final Draft

Recode Chatham is nearing completion but, first, we want to hear from you!

Recode Chatham is a project to consolidate and update Chatham County's development regulations based on policies in Plan Chatham, the County's Comprehensive Plan adopted in 2017, and recommendations in the Audit Report prepared at the start of the project. The primary result of the project is the new Unified Development Ordinance (UDO), which serves as the primary regulatory document that guides all development and land use in the county.

The consulting team worked with Chatham County staff and the Planning Board's UDO Subcommittee to draft the UDO in three modules, which the consulting team presented to the Board of Commissioners (BOC) and Planning Board (PB) in 2023 and 2024. This final draft of the UDO includes input from the BOC and PB as well as community input received during the drafting process.

The BOC and PB will consider adopting the UDO this fall. We welcome community input on this final draft, which you can provide directly in this draft after registering with your email address. The deadline to provide comments online is Thursday, October 10. County staff and the consulting team will prepare a summary of the comments received, and the BOC will decide whether to revise the final draft of the UDO prior to adoption. If you have questions, please contact the project team.

File name:

-

File size:

-

Title:

-

Author:

-

Subject:

-

Keywords:

-

Creation Date:

-

Modification Date:

-

Creator:

-

PDF Producer:

-

PDF Version:

-

Page Count:

-

Page Size:

-

Fast Web View:

-

Choose an option Alt text (alternative text) helps when people can’t see the image or when it doesn’t load.
Aim for 1-2 sentences that describe the subject, setting, or actions.
This is used for ornamental images, like borders or watermarks.
Preparing document for printing…
0%
Document is loading Loading Glossary…

Summary

All Hide

UDO Summary

Expand

Chapter 1: Introduction

This Chapter identifies the purposes of the UDO and its relationship to other regulations and plans, specifies the genreal applicability of the regulations, and establishes the UDO's effective date.

Chapter 2: Zoning Districts

Chapter 2 establishes 15 conventional zoning districts, including five new districts, five new conditional zoning districts, and parallel conditional zoning districts for most of the conventional districts. 

Chapter 3: Use Regulations

Chapter 3 regulates principal, accessory, and temporary land uses. Principal uses are either permitted (P) or limited (L) or require establishment of a conditional zoning district (C). Limited uses require compliance with use-specific conditions. 

Some accessory and temporary uses require compliance with use-specific conditions as well as general standards (like setbacks). 

Chapter 4: Development & Design Standards

Chapter 4 establishes development and design standards, including standards for building design, landscaping and screening, parking and loading, lighting, and signs. This Chapter incorporates and, in some cases, updates the Chatham County Appearance Commission's Design Guidelines, which are now required elements for certain types of development. 

Chapter 5: General Subdivision Standards

Chapter 5 establishes general design requirements, such as perimeter buffers, for all subdivisions, as well as standards for six subdivision designs: 

  1. Conventional
  2. Conservation
  3. Compact
  4. Agricultural
  5. Townhouse
  6. Non-Residential 

Chapter 6: Conservation & Open Space

Chapter 6 consolidates open space requirements for new developments and provides a menu of open space types that may be used to meet the requirements. The chapter establishes buffer requirements for cemeteries intended to preserve existing cemeteries in Chatham County and protect them from encroachment by new development. It provides new tree protection standards recommended by Plan Chatham, the Appearance Commission, the Tree Protection Working Group, and County staff. Finally, the chapter establishes long-term preservation and maintenance requirements for all conservation and open space. 

Chapter 7: Infrastructure & Public Improvements

 

Chapter 7 updates and revises the requirements for developers to install infrastructure in new developments. Important changes include:

  1. A requirement for infrastructure improvements to non-residential development;
  2. Adoption of new street framework with public streets, private streets, and private driveways that requires dedication of public streets in major subdivisions, requires private streets to comply with NCDOT design standards, and allows gravel access by private easement for subdivisions of 15 or fewer lots;
  3. Addition of new street connectivity standards;
  4. Clarifies and requires pedestrian and multimodal transportation infrastructure; and
  5. Adds location standards for wastewater treatment facilities on development sites.

Chapter 8: Watershed & Riparian Buffer Protection

Chapter 8 significantly simplifiies the County's current Watershed Protection Ordinance and includes the following key changes:

  1. The low-density development option is maintained;
  2. The high-density option is added for certain areas. The built-upon maximums in this Chapter are set at higher levels than what will be allowed in the base zoning districts. In addition, all single-family development is assumed to include 100% built-upon area, which will limit development intensity compared to the maximum that would be allowed under state law.

Chapter 9: Stormwater Management

Chapter 9 establishes minimum requirements and procedures to control the adverse effects of increased stormwater runoff and non-point and point source pollution associated with existing and new developments and redevelopments, as well as illicit discharges into any conveyance or any waters of the State. 

Chapter 10: Soil Erosion & Sedimentation Control

Chapter 10 regulates certain land-disturbing activity to control accelerated erosion and sedimentation in order to prevent the pollution of water and other damage to lakes, watercourses, and other public and private property by sedimentation. This Chapter generally carries forward the County's current Soil Erosion and Sedimentation Control Ordinance and incorporates revisions proposed by staff.

Chapter 11: Flood Damage Prevention

Chapter 11 seeks to minimize public and private losses due to flood conditions in specific areas by establishing provisions designed to:

  1. Restrict or prohibit uses that are dangerous to health, safety, and property due to water or erosion hazards or that result in damaging increases in erosion, flood heights, or velocities;
  2. Require that uses vulnerable to floods, including facilities that serve such uses, be protected against flood damage at the time of initial construction; 
  3. Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters;
  4. Control filling, grading, dredging, and all other development that may increase erosion or flood damage; and
  5. Prevent or regulate the construction of flood barriers that will unnaturally divert floodwaters or that may increase flood hazards to other lands.

Chapter 12: Procedures

Chapter 12 consolidates most UDO procedures and maps each with a common workflow. As noted in 12.1.2: Applicability, some procedures, such as those related to Watershed Protection and Soil Erosion and Sedimentation Control, will remain with related provisions in their own chapters.

Chapter 13: Reviewing & Decision-Making Bodies

Chapter 13 specifies the role of each elected body, appointed body, and staff person with respect to UDO approval processes and administration. 

Chapter 14: Nonconformities & Vested Rights

Chapter 14 is a comprehensive chapter to deal with existing situations, ranging from permits in progress to more comprehensively addressing different types of nonconformities (uses, lots, structures, and site improvements). It also includes State law requirements related to permit choice and vested rights.

Chapter 15: Enforcement

Chapter 15 establishes the procedures to enforce compliance with this UDO and to mandate corrections for violations of this UDO or conditions of a development approval issued under this UDO and the remedies and penalties available to Chatham County to enforce compliance with this UDO.

Chapter 16: Rules of Interpretation & Measurement

Chapter 16 establishes general rules for interpreting the UDO and zoning map and describes how to resolve conflicts in County Codes, or between the UDO and state law or administrative procedures, federal law, or private restrictions. This Chapter also establishes rules for measurement or calculation of UDO standards, such as lot area and height.

Chapter 17: Definitions & Acronyms

Chapter 17 is the UDO's glossary. It defines acronyms, terms, and phrases used in the UDO. This Chapter includes most definitions though some chapters, like Chapter 9: Stormwater Management, include defintions specific to that chapter. 

Chapter 18: Submittal Requirements

Chapter 18 establishes the information applications must include to be considered complete for review under Chapter 12: Procedures.

Appendix A: Plant List

Appendix A lists plants that may be used to comply with UDO landscaping and planting requirements. 

Appendix B: Invasive Plant List

Appendix B lists invasive plants that cannot be used to meet UDO landscaping and planting requirements. 

AI Tools

Hide

Welcome to your personal document assistant, powered by AI.

You can ask me questions and I will review the document to provide answers with page references for you. Please be patient, it might take a second and note that I might not always get it right (especially if the answer is located in a table, which I have trouble analyzing) - if you have questions it's easy to check the page sources or contact staff to clarify. 

Start with a general question and then follow up with additional questions to narrow the focus of the response if needed.

What would you like to know?

Powered by Konveio
View all

Comments

Close

Commenting is closed for this document.